Renewable Energy
설치시공
Installation
Solar power business concept
Department selection criteria
Review geographical conditions
- Whether to gain access to solar power plant construction sites
(Minimum 4m)
→ Difficulty in carrying out business if there is no access road - Determine how far left, right, and front shadow effects can be.
- Check the occurrence of civil engineering costs such as landfilling and soil cutting.
- How far is KEPCO Samseong Jeonju from the business site.
- Check how much solar power capacity is available.
- Ensure that power generation business permits are available.
(Confirmation of KEPCO grid connection) - Confirmation of official site of site (rice field, field)
- Determine if development activity is possible
(Agricultural promotion area, military facility protection area, cultural property protection area)
Neighboring area
- Distance from site to town boundary
(See the Local Authority Ordinance) - Distance to facilities such as housing (see local municipal ordinance)
- Confirmation of complaints around business premises before purchase
- Confirmation of development activity permission (Guideline for permission to operate, permission for development activity permission)
- Prohibition of development activities in the contact area
(Highway [10m], general highway [5m], local road [5m])
Required documents
Electricity Business License Application Form | Apply for PPA | Report construction plan |
|
|
|
Application form before use | Business start notification form | Equipment confirmation |
|
|
|
Step

Plan for facility construction
Facility overview
Installation type: Fixed slope type installed on general land

Installation type: Slope fixing type installed on the upper part of the building

※ This image is an image for reference purposes only.
Construction equipment details
Solar power system – 100kW | ||
Installation Specification (Design basis) |
Solar cell module | Hansol Technics / 300W modules total 300 |
Volume | 100kW | |
Inverter | SUNGROW / SG50KTL-M Series (2 units) | |
Structure | Inclined fixed type (20°, Hot-dip galvanizing) | |
Monitoring | SUNGROW Monitoring system | |
※ Depending on the equipment supply plan, it can be replaced with equivalent equipment or more. |


※ This image is an image for reference purposes only.
Solar power business procedure

※ Notification of construction plan
If the approval of development activity review committee is rejected at the time of application for development activity, administrative litigation is proceeded after complaint filing.